>A Measurement of $e^+ e^- \to \bar{p} p$ for 1975-{MeV} $\le \sqrt{s} \le$ 2250-{MeV}

Bisello, D. ; Limentani, S. ; Nigro, M. ; et al.
Nucl.Phys.B 224 (1983) 379, 1983.
Inspire Record 190558 DOI 10.17182/hepdata.33935

The e + e − → p p cross section has been measured in the energy interval (1975 ⩽ 2 E ⩽ 2250) MeV for |cos θ | < 0.7. The measurement is based on ∼ 100 events, thus improving by a factor 3 on the previous existing statistics in this energy interval. The form factor | G | 2 is given as a function of energy under the assumption | G E | = | G M |. We also give the first measurement of the differential cross section, averaged over the energy interval, and estimate the ratio G M |/| G E | from it.

3 data tables match query

No description provided.

No description provided.

No description provided.


Measurements of the proton elastic form-factors for 1-GeV/c**2 <= Q**2 <= 3-GeV/C**2 at SLAC

Walker, R.C. ; Filippone, B. ; Jourdan, J. ; et al.
Phys.Rev.D 49 (1994) 5671-5689, 1994.
Inspire Record 360764 DOI 10.17182/hepdata.22469

We report measurements of the proton form factors GEp and GMp extracted from elastic scattering in the range 1≤Q2≤3 (GeV/c)2 with total uncertainties < 15% in GEp and < 3% in GMp. Comparisons are made to theoretical models, including those based on perturbative QCD, vector-meson dominance, QCD sum rules, and diquark constituents in the proton. The results for GEp are somewhat larger than indicated by most theoretical parametrizations, and the ratios of the Pauli and Dirac form factors Q2(F2pF1p) are lower in value and demonstrate a weaker Q2 dependence than those predictions. A global extraction of the elastic form factors from several experiments in the range 0.1 0.1<Q2<10 (GeV/c)2 is also presented.

6 data tables match query

Point-to-point systematic uncertainty is 0.5%, overall normailzation uncertainty is 1.9%.

Point-to-point systematic uncertainty is 0.5%, overall normailzation uncertainty is 1.9%.

Point-to-point systematic uncertainty is 0.5%, overall normailzation uncertainty is 1.9%.

More…